REGULATION OF TECHNOLOGICAL PROCESSES
CZ EN
www.rtp.czReferencesOther referencesTechnological Outfitting of Buildings

Technological Outfitting of Buildings

  • CTP Invest - from 2004 until 2008, supply of AMiT measurement and regulation systems for manufacturing, logistical and administrative buildings in the developer areas in Brno-Modrice, Brno-Cernovicke Terasy, Ostrava-Hrabova, Bor u Tachova, Liberec, Okrisky and Ceske Velenicie. In all, more than 25 storage and manufacturing facilities are involved, with a total surface area exceeding 100,000 m2. For more information, see the graphic in the reference section.
  • Pliva-Lachema Energy Monitoring - energy dispatching
  • Pliva-Lachema Imunologie VS - high-voltage electricity, measurement and regulation
  • Konopiste State Castle - monitoring of heat and humidity
  • Pliva-Lachema Change gas/steam boiler 12t/h - high-voltage electricity
  • Pliva-Lachema Oxaliplatin - heat source, high-voltage electricity, measurement and regulation
  • Pliva-Lachema Vyrobna 1 injection VS - high-voltage electricity, measurement and regulation
  • Pekarna GROTTO Kremnica - high-voltage electricity, measurement and regulation, automatic system control
  • Automotive Lighting - high-voltage electricity, measurement and regulation
  • Archdiocese Museum of Olomouc - ventilation, high-voltage electricity, measurement and regulation, automatic system control
  • Konopiste State Castle – Supply and assembly of air-conditioning technology, including MaR system in the historic building – exposition, depository
  • UPS Supply Chain Solutions Liberec – Supply and assembly of MaR system on the grounds of the Technology Park in Liberec
  • National Gallery Prague – Anezskύ Convent – complete climate control system for the historical building, including a DESIGO INSIGHT operations and dispatching center - Siemens Landis&Staefa
  • DANZAS Phase II – Supply and assembly of warehouse MaR system in the Technology Park in Brno Modrice
  • Gebruder Weiss – Supply and assembly of warehouse MaR system in the Technology Park in Brno Modrice
  • Drusped Lagermax – Supply and assembly of warehouse MaR system in the Technology Park in Brno Modrice
  • NUNNER – Supply and assembly of warehouse MaR system in the Technology Park in Brno Modrice
  • PST Ostrava Corp. – Supply and assembly of warehouse MaR system in the Technology Park in Brno Modrice
  • IFE CR Corp. Phase II – Supply and assembly of MaR system in the expanded manufacturing building at the Technology Park in Brno Modrice
  • MERGON – Supply and assembly of MaR system in the MERGON manufacturing building at the Technology Park in Brno Modrice
  • PSM International – Supply and assembly of MaR system in the MERGON manufacturing building at the Technology Park in Brno Modrice
  • DPmB Corp. – reconstruction of heat transfer station, TECO measurement and regulation system, including PROMOTIC local and distant dispatching
  • SKANSKA Shopping Center Cestlice – new construction of the grounds – Amit measurement and regulation system, including Promotic dispatching center
  • STAROBRNO a.s. – supply and assembly of heat transfer station, including heating technology, high-voltage electricity, measurement and regulation and other distribution systems
  • VALEO Rakovnik – Supply and assembly of MaR system for VALEO Autoklimatizace in Rakovnνk
  • Kryty bazen Karvinna – Modernization of energy management – measurement and regulation by Amit, including dispatching center
  • Gymnazium Zizkova – Remodeling of exercise area – measurement and regulation – Siemens Landis&Staefa control system
  • CARGO-VAN – regulation of radiant heating – three phases measurement and regulation Siemens Landis&Staefa control system
  • SMC Industrial Automation CZ s.r.o. – supply and assembly of air-conditioning system for the administrative building
  • IFE CR a.s. – supply and assembly of ventilation system in the air-conditioned manufacturing building, including refrigeration and humidification technology, high-voltage electricity, measurement and regulation and other distribution systems
  • Prague National Gallery – Renovation of the MaR system after a flood, enviromental optimization of the historical exhibits – Siemens Landis&Staefa control system
  • Brno Emergency Hospital – reconstruction of operating theaters Phases I, II and III – measurement and regulation system by Siemens Landis&Staefa
  • Pliva – LACHEMA Brno – Quality Pavillon – measurement and regulation of heat transfer station, Siemens Landis&Staefa system, including visualization
  • National Gallery Prague – Anežskύ Convent – Measurement and regulation of the boiler and entire air-conditioning system – Siemens Landis&Staefa
  • VW Bratislava – air-conditioning of the operations building – measurement and regulation using a Siemens Landis&Staefa system, including dispatching center
  • OLYMPIA Shopping Center Brno – installation of high-voltage electricity, measurement and regulation for 26 commercial units – Sauter control system
  • CARREFOUR Shopping Center Ostrava – installation of high-voltage electricity, measurement and regulation for several commercial units
  • T.G.Masaryk Hospital Hodonin – reconstruction and remodeling of the outpatient center and operating theaters – Siemens Landis&Staefa measurement and regulation system, including Desigo Insight dispatching center
  • Cathedral of Sts. Peter and Paul – complete reconstruction of wiring and lighting in this historic cathedral
  • Operation Building Vseobecna zdravotni pojistovna Kromeriz – Landis & Gyr measurement and regulation system, high-voltage electricity.
  • Gasification of Form Thermit Corp. – measurement and regulation using a system by Landis & Gyr, high-voltage electricity.
  • Gasification of Skrobarny Brno Corp. – measurement and regulation, high-voltage electricity.
  • MANA Ostrava – Euronova, measurement and regulation, high-voltage electricity, ventilation
  • MANA Most Ostrava – Euronova, measurement and regulation, high-voltage electricity, ventilation
  • Masaryk University – Heat transfer station for Rector’s Office, Landis Staefa.
  • Gasification of STS Hulin – measurement and regulation – Landis & Gyr system, high-voltage electricity.
  • Gasification of CD Val. Mezirici rolling stock depots – measurement and regulation – Landis & Gyr system, high-voltage electricity.
  • Gasification of boilers, Jasanova Street in Brno – measurement and regulation – Johnson Controls system, high-voltage electricity.
  • Areal PBS Investorskα Brno Hlinky boiler, air-conditioning – measurement and regulation – Landis & Gyr system, high-voltage electricity.
  • Minorite Monastery Brno – measurement and regulation – Landis & Gyr system, high-voltage electricity.
  • Reconstruction of boiler and air-conditioning for the gymnasium at the Veterinary Faculty – measurement and regulation – Landis & Gyr system, high-voltage electricity.
  • Commercial building at Josefska 10, Brno, reconstruction of boiler and air-conditioning – measurement and regulation – Landis & Gyr system, high-voltage electricity.